Demonstrator

   » Goals

   » Deployment

   » BatLab

» Deployment
The DEMOCRAT project demonstrator is presently deployed in a provisional site within the industrial facilities of Efacec, in Maia, Portugal. As of January 2020, the Battery Energy Storage System (BESS) is already installed, with a 3-phase connection to the LV grid. The 15 kV grid connection will be implemented at the final demonstrator site, yet under construction.
The BESS also feeds a micro-grid, presently composed by a QC 45 electric vehicle fast charger and a load bank, both representing an overall load of 43 kVA and 250 kVA, respectively.
 
View of the Battery Block, with the adjacent QC 45
 
View of the Battery Block and the PCS Block,
with the adjacent load bank
Detailed view of the load bank  
For more details about the demonstrator, please follow this link.