News & Events

   » News

   » Events

» Other News

Installation of the battery system at the demonstrator, Maia, Portugal, May, 2019

 

In May, the Battery Block was installed at the industrial facilities of Efacec, in Maia, Portugal.

 
150
View of the installation of the Battery Block
150
Another view of the installation of the Battery Block
150
Final installation of the Battery Block besides the PCS Block