» Other News |
Installation of the battery system at the demonstrator, Maia, Portugal, May, 2019 |
|
In May, the Battery Block was installed at the industrial facilities of Efacec, in Maia, Portugal.
|
|
View of the installation of the Battery Block |
Another view of the installation of the Battery Block |
Final installation of the Battery Block besides the PCS Block |
|
|